Construction Cost Estimator
Get a quick construction cost from the built area and your local rate per area, with contingency, overhead and tax.
How it's calculated
Base = area × rate per unit area. Contingency is added to the base, overhead and profit to that subtotal, and tax to the result.
Each measurement has its own unit menu, so you can enter whatever your plans use. Results are shown in several units at once.
Worked example
With total covered area 100 m², cost rate 500, rate is per: square metre, contingency 10 %, overhead and profit 15 %, tax 0 %, the calculator gives: base cost $ 50,000.00; contingency $ 5,000.00; overhead and profit $ 8,250.00; tax $ 0.00; total estimate $ 63,250.00; total per square metre $ 632.50; total per square foot $ 58.76.
Good to know
This is a rough early-stage figure and not a quote. Rates change with location, finish level and material prices, so get local quotes before committing.
Frequently asked
How much contingency should I add?
Five to ten percent is common on a well-defined project, and 15 percent or more on renovations or uncertain ground.
Does this include land cost?
No. Land, permits and design fees are separate.